DESIGN AND OPERATIONAL CHALLENGES WITH TIME AND MOTION (T&M) STUDIES RUN ALONGSIDE CLINICAL TRIALS

Author(s)

De Cock E1, Payne KA2, Urspruch A31United BioSource Corporation, Barcelona, Spain, 2United BioSource Corporation, Dorval, QC, Canada, 3F. Hoffmann-La Roche, Basel, Switzerland

OBJECTIVES: T&M studies are designed to collect observational data to quantify efficiency-related outcomes, mainly staff-time and consumables associated with medical interventions. Our aim is to describe scientific and operational challenges that were observed when implementation a T&M study alongside a clinical trial. METHODS: T&M-method involves repeated observations of pre-identified tasks associated with a process in order to measure task durations to estimate total process time. As part of a multi-centre T&M study run as a sub-study to a clinical trial, we identified key design parameters that drive robustness as well as process elements that are critical factors to successful operational conduct. RESULTS: T&M-endpoints are to be carefully selected to align with their final use as inputs in e.g. economic models. As part of a trial that investigates time for a new route of administration (subcutaneous as alternative to intravenous), it is important to discuss with staff the applicability of task descriptions, with local CRF adjustment justifiable if providing more accurate time measurements. Trial protocol determines number and timing of observations, leading to sample size restriction and potentially extended study period. In the absence of clear guidelines on T&M study classification, regulatory processes are to be well understood, and absence of patient interaction clearly stated. Initiation of T&M-sub-study together with First-Patient-In is crucial to avoid losing valuable observations. Sites prefer to be given options for selecting observers, but ideally observers are external to the care unit (within or outside the hospital) and are competent and available during study period. As sites are inexperienced with T&M-method, streamlined communication and focused training proved crucial. CONCLUSIONS: T&M-methodology is associated with important design and operational challenges that must be identified early on to guarantee a scientifically robust design and operational feasibility, with the ultimate aim to produce valid efficiency-related data in support of economic analyses.

Conference/Value in Health Info

2012-06, ISPOR 2012, Washington, D.C., USA

Value in Health, Vol. 15, No. 4 (June 2012)

Code

PHP46

Topic

Economic Evaluation

Topic Subcategory

Cost/Cost of Illness/Resource Use Studies

Disease

Multiple Diseases

Explore Related HEOR by Topic


Your browser is out-of-date

ISPOR recommends that you update your browser for more security, speed and the best experience on ispor.org. Update my browser now

×